Installation of approximately 80 sqft of Quartz countertops into an existing kitchen. \r
\r
Sales: Went very well. Michael Dean was very professional and knowledgeable, even let us go to his supplier and select the slab!!\r
\r
Template: He showed up on time and did a very thorough and detailed job of measuring and building frames.\r
\r
Installation: The installation was done on time and everything was exactly as ordered. There was a lot of dust left over and it did take awhile for me to clean it up. The only issue was that the caulk was not what we asked for and it was too dark. However, Michael Dean came out a few days later and replaced the caulk with one that matched perfectly.\r
\r
We are thrilled with our new kitchen.\r
more