Laminate job \r
\r
I hired this company to install almost 1600 square feet of Laminate and demo work on existing floor. The installer was a nice enough kid. The first day they did the demo on about 600 sq feet, worked about 5 hours. the second day some baseboards were removed and they began laying the laminate. The crew worked 4 hours, went to lunch and came back layed a couple more runs and left at 3:30. The crew said they would be back the next morning. After they left I inspected the work, a total of 322 sq feet was laid, one run had a seem sticking up, they glued it. This is unnaceptable for a professional installer on Laminate, especially in a hallway. I went into the bathroom and found several pieces of molding with the nails sticking up just waiting to be stepped on. There were also nails laying on ... more\r
\r
I hired this company to install almost 1600 square feet of Laminate and demo work on existing floor. The installer was a nice enough kid. The first day they did the demo on