Report a problem
Judy's Book takes violations of our Terms of Use very seriously. We encourage
you to read through our
Terms of Use
before filling report with us.
After careful review, we may remove content or replace a content warning page before
viewing content deemed offensive, harmful, or dangerous.
Additionally, we are aware that there may be content on Judy's Book that is personal
in nature or feels invasive. Please note that Judy's Book is a provider of content
creation tools, not a mediator of content. We allow our users express their opinions,
but we don't make any claims about the content of these pages. We strongly believe
in freedom of expression, even if a review contains unappealing or distasteful
content or present negative viewpoints. We realize that this may be frustrating,
and we regret any inconvenience this may cause you. In cases where contact information
for the author is listed on the page, we recommend that you work directly with this
person to have the content in question removed or changed.
Here are some examples of content we will not remove unless provided with a court
order:
Personal attacks or alleged defamation
Political or social commentary
Distasteful imagery or language
If we've read the Terms of Use and believe that this review below violates our Terms
of Use, please complete the following short form.
Businiess name:
Bella Pools of South Florida
|
Review by:
Guest
|
Review content:
Owner & General Manager Mike quoted 7-10 days for the completion of the project, which included new travertine pavers, new coping, new waterline tile and Diamond Brite. During the initial meetings the GM was given a style sheet complete with all choices, including photos, names and, when appropriate, stock numbers. The project began on 12/1/2014 with the first 2 days involving the demolition of the existing patio; there was no further movement on the project until late in the day on 12/9/14. The “crew” scheduled to install the patio, ended up being 1 person, and as a result, this portion of the project alone took until 12/15/14, and includes a poorly laid surface with ragged cuts and rocking stones. Additionally, this “crew” installed and grouted the waterline tile without the agreed upon decorative tiles. To correct this, the incorrect tiles were popped off and the correct tiles installed and grouted approximately 30 minutes before the Diamond Brite installation began. Those tiles now sit proud of the rest of the tiles because a new layer of mortar was simply slapped on over the old instead of being installed properly. Final clean-up resulted in debris being stacked on our neighbor’s lawn without his consent (he was a saint about this) for several days. It appears most of the products needed for this project were ordered in advance, even though the project was scheduled over 3 weeks out, and many were ordered incorrectly resulting in unnecessary delays. Paver installation delay was due to the wrong color paver being ordered. Additional delays stemmed from the decorative tiles being ordered after the plain field tiles were already installed. Finally, in an effort to be done with this project and the pain of dealing with this company, we accepted the final mistake made by Bella Pools, the Diamond Brite crew arrived with the wrong color product.
|
Reasons for reporting (512 characters left):
|
Reasons are required.
|
or
Cancel
|