There were a few glitches along the way, but overall the work was professional and on schedule. Now I have a regular air conditioner and an evaporative cooler. If one fails in the middle of a hot day, I now have an alternative. Since I am on a variable rate schedule with the power company, I can choose the lower-cost option when electricity is most expensive. Further, I chose a 120 volt unit, so I can run the evaporative cooler from a portable generator if the power fails. The best time to get this type of work done is in the fall and winter.
more