Jerry was in a hurry to finish our bathroom remodelling and his work was sloppy.
There were many things which he did badly and there is no way of fixing it easily or cheaply.
He even asked to be paid the final check when his work wasn't complete as we had agreed on.
1) He left our marble vanity top badly scratched from placing his tools on it.
We asked him to fix the problem and he sandpapered parts of our vanity and took the shine off. It was pointless. He also did this to our brand new toilet seat and I now will have to replace it.
2) He slapped on grout over the pebbled surface and left the job for the labor day weekend. When he returned, it was too late to wipe off the grout. It looks terrible. I could have done a better job.
3) The tiles are all uneavenly spaced and our shampoo shelf is missing two tiles. He grouted over this to hide it.
4)He cut all the times at a hard angle and stuck them in a very ugly way.
5) We agreed that the tiles should be installed horizontally and found that he had finished installing all the tiles VERTICALLY!.
6)Jerry worked on our bathroom before we moved in. One day I decided to drive over to check on the progress and I walked into a refrigerator. He had left the AC on and left the property for the day.
I don't know how many days it had been on continuously but my power bill came up to a lot for the month that it was uninhabited. One other time, he had left the garage door open and another time, the back door unlocked.
We should not have paid Jerry the full amount which we had agreed upon becuase of his sloopy work but in the end, we just wanted him to leave and never come back.
Do a image search for jerry nieman construction on google to see his sloppy work.
more