The worst contracting company ever.\r
They have delayed our construction 4 (!) times. And every time they've promised it would be the last delay. We wasted a lot of money for a hotel (we stopped our lease after P&S signing and before the first delay came up), storage for our stuff, moving to storage... Obviously they didn't compensate for anything.\r
Then they ran out of tile and granite for the countertops we chose and offered us to make new choice from a lot less options.\r
They ""forgot"" about all the verbal promises they made. That we will be able to come when electrician works and show all the places for outlets, they will divide for us light and fan switches in master bathroom, they will provide hookup for gas dryer, etc. They were ready to do everything we wanted before P&S agreement and nothing after.\r
Finally, then we got the house we were shocked by the quality: curved walls, scratches on the kitchen cabinets, broken lock on a window, chipped corner of the tiles on the floor, ugly light fixtures (different from ones in model house), a hole in the garage wall, unpainted doors, scratched window sills and door frames, inaccurate putty holes on walls. It looked as if blind people built it. And moreover the house was dirty, they haven't clean it after cunstruction. And moreover there was very dirty in the house, since they haven't cleaned it after construction.\r
It was unbelievably stressful 2 months of our life and we are really disappointed with what we got.\r
\r
We moved in 1 week ago and house is still not finished, nobody comes to complete the work and the Internet will be provided in one month. Maybe...
more