Report a problem
Judy's Book takes violations of our Terms of Use very seriously. We encourage you to read through our Terms of Use before filling report with us.
After careful review, we may remove content or replace a content warning page before viewing content deemed offensive, harmful, or dangerous.
Additionally, we are aware that there may be content on Judy's Book that is personal in nature or feels invasive. Please note that Judy's Book is a provider of content creation tools, not a mediator of content. We allow our users express their opinions, but we don't make any claims about the content of these pages. We strongly believe in freedom of expression, even if a review contains unappealing or distasteful content or present negative viewpoints. We realize that this may be frustrating, and we regret any inconvenience this may cause you. In cases where contact information for the author is listed on the page, we recommend that you work directly with this person to have the content in question removed or changed.
Here are some examples of content we will not remove unless provided with a court order:
Personal attacks or alleged defamation
Political or social commentary
Distasteful imagery or language
If we've read the Terms of Use and believe that this review below violates our Terms of Use, please complete the following short form.

Businiess name:  Design IV The Times
Review by:  bryan k.
Review content: 
Design for the Times/D4X builders was hired on 1/11/14 to construct and upstairs addition on my cape cod style home. The total cost for labor and materials was not to exceed 40,000.Design for the Times/D4X builders started work on 2/10/14 and was paid 12,000 for purpose of scheduling inspection appointments,ordering all material,reviewing,and representing and was also paid 4,000.00 upon signing retainer at time of acceptance.The payments per week was 3,000 a week until reaching 3/28/14 in which the last 3,000.00 check would be withheld until completion of job. The time frame in contract was not to exceed 8 weeks.6 weeks and 31,000 paid to Joseph Del Villar of Design for the Times/D4X builders and they did not even have a completed frame for addition.This company has left me without a roof,floor,electric in addition as well as existing home,no insulation,no rooms completed,caused extensive damage to my existing home,built structure and electric not up to code as well as damaged my existing structure and electric,no siding,no windows,caused extensive water damage to my home on two occasions due to an insufficient covering of roof they had torn off,damaged exterior and interior of home-never fixed per addendum contract,thousands of dollars spent in oil/electric bills due to incomplete job,performed no clean up ever since started,took down lights in home due to workers damaging existing sheetrock in every single room in the entire home,has left us with no lights/outlets in several rooms,Design for the Times / D4X builders has walked off the job and failed to return any of my phone calls with all of the above items not resolved. Joseph Del Villar has refused to refund any of my 31,000 I have paid him to complete a 40,000 addition leaving my family to reside in an unsafe,unfinished and has left my home in UN-livable condition.Mr. Del Villar has not used money given to purchase material and claimed he used all nor is material onsite. Beware of Joseph Del Villar takes your money then walks and does not complete the job.