5/30/11-proposal submitted after meeting with Anthony Obedoza, 6/10/11-proposal approved. We did the demo to save money. The job- install new master bathroom flooring, new shower with 2 recessed lights and add 1 new outlet. The price for the job seemed high but went ahead since it was work we could not do. The approval states-Install Date-ASAP. Requested Install Date 6/27.It would take longer because they had to order the materials. Anthony said it should be done by the end of July. Job was completed the last week of Aug. We called and left messages on Aug 30-31, no one returned our call. Sept 2 I sent an email detailing the problem. The shower door did not shut, the doors are glass and we had to push on one side of the glass to get the door shut. The caulking was cracking and peeling away, the worst around the shower seat. Anthony tells me that the door SHOULD be in Oct/26/11. On Oct. 24th we get an email stating the door did not make the truck. On Oct/27/11 Anthony said Virgil wou