Long range planning throughout four substation service areas focused on capacity for growing loads and redundant service to critical consumers. A phased construction approach will allow the cooperative to attack critical portions of the system first, deteriorated and overloaded conductor, poles and other equipment. The DHA plan addressed the system construction requirements into four phases based on load level rather than time allowing for variations in projected load requirements. This is what Inland Power and Light is about.